Following an in-depth site study, Baskervill renovated labs and office spaces at AdvanSix’s facility in Chester, Virginia. With plans to relocate research and development operations from its previous outpost to a multi-building campus, our architecture team worked closely with our in-house MEP studio and Alliance Engineering to make sure both the lab and administrative buildings met the needs of the chemical company. In the 8,000 SF office building, existing materials were stripped to create a modern workspace equipped with conference rooms, small meeting areas, and work zones. The 44,000 SF multi-story lab dedicated to new product development and testing features analytical, polymer, and chemical lab spaces and is designed to make production equipment from the old facility conducive to the new space.